[Oct 31, 2021] Latest NCS-Core PDF Dumps & Real Tests Free Updated Today [Q46-Q67]

Share

[Oct 31, 2021]  Latest NCS-Core PDF Dumps & Real Tests Free Updated Today

NCS-Core Dumps With 100% Verified Q&As - Pass Guarantee or Full Refund

NEW QUESTION 46
Refer to the exhibit.

After performing ESXi to AHV conversion on a cluster, the alerts shown in the exhibit display on Prism. What should the administrator do to resolve this issue efficiently?

  • A. Remove the VMs. create a new Protection Domain, and add VMs to it
  • B. Delete the Protection Domain, create a new Protection Domain, and add the VMs to it
  • C. Create a new Protection Domain and add the VMs to rt.
  • D. Remove VMs from the Protection Domain and add them back in.

Answer: D

 

NEW QUESTION 47
An administrator wants to utilize Network Visualization to monitor the physical and logical network on the Nutanix cluster. The first-hop switch has LLDP enabled. The network switch informationis still not being displayed.
What is causing this problem?

  • A. The cluster is using RDMA-enabled NICs.
  • B. The ISL between switches is not configured.
  • C. SNMP is not configured properly.
  • D. br0 and br1 are not defined.

Answer: C

Explanation:
Explanation
ref:https://portal.nutanix.com/page/documents/details?targetId=Web-Console-Guide-Prism-v55:wc-network-visu

 

NEW QUESTION 48
A consultant successfully installs the Foundation VM on a laptop and needs to ensure the VM can communicate externally.
Which two configuration changes should the consultant make next? (Choose two.)

  • A. Configure the static IP address through the desktop virtualization software.
  • B. Open terminal and configure via ifconfig command.
  • C. Ensure the vNIC is set to bridged adapter.
  • D. Run the set_foundation_ip_address application on the VM desktop.

Answer: C,D

 

NEW QUESTION 49
A system administrator needs to shut down an AHV node in a Nutanix cluster without causing service disruption. The administrator checks data resiliency and verifies that the cluster can tolerate a node down.
Which three steps should the administrator perform next? (Choose three.)

Answer:

Explanation:

Explanation
1 allow vms2 sd CVM3 sd node

 

NEW QUESTION 50
An administrator is migrating 5MB shares from a third-party platform to Nutanix Files with the following characteristics:
* Shares contain user profile directories
* DFS-N will be used
How should the administrator create target shares for this migration?

  • A. Create multiple general purpose shares and distribute migrated data as evenly as possible.
  • B. Create distributed shares with multiple top-level directories and distribute migrated data.
  • C. Create multiple distributed shares and distribute migrated data as evenly as possible.
  • D. Create standard shares with multiple top-leveldirectories and distribute migrated data.

Answer: B

Explanation:
Explanation
Ref:https://portal.nutanix.com/page/documents/details/?targetId=Files-v3_6:Files-v3_6

 

NEW QUESTION 51
A consultant creates a four-node AHV cluster with two 1GbE (eth0, etc1) and two 10GbE (eth2, eth3) NICs per node. The 1GbE NICs will not be placed into service, but the customer wants the network to be preconfigured for their eventual use.
The consultant removes the 1GbE NIC from the default bond and creates a second bridge(br1), but is unable to add the 1GbE NIC using the below command:
manage_ovs -bridge_name br1 -interfaces 1g -bond_name br1-up update_uplinks Which parameter is missing from this command?

  • A. --bridge_duplex full
  • B. --require_link=false
  • C. --interfaces eth0
  • D. --bond_duplex full

Answer: C

 

NEW QUESTION 52
During the Knowledge Transfer, the customer askes where to find the details about their Nutanix environment, such as IP addresses, storage containers, and configuration.
Where can the consultant find this information?

  • A. Support Portal
  • B. Tech Checklist
  • C. Test Plan
  • D. As-Built Guide

Answer: D

 

NEW QUESTION 53
A consultant is using the Foundation applet to create a cluster. During the process the consultant refreshes the progress bar web page and is concerned when nothing loads.
What should the consultant do to verify that Foundation has completed successfully?

  • A. Return to the Foundation configuration page and start over.
  • B. Update Java on the Foundation VM.
  • C. Restart the Foundation process.
  • D. Connect to any CVM IP address from a web browser.

Answer: D

 

NEW QUESTION 54
Which subnet is reserved for internal connectivity within a Nutanix Cluster?

  • A. 192.168.5.0/26
  • B. 192.168.5.0/23
  • C. 192.168.5.0/24
  • D. 192.168.254.0/24

Answer: C

 

NEW QUESTION 55
An administrator is deploying a three-tier application on a Nutanix Enterprise Cloud consisting of web, application, and database VMs. Traffic between theservers must be limited to specific services/ports. There is an application layer firewall VM deployed on one host in the cluster.
In which way should the administrator meet this requirement?

  • A. Categorize the VMs in Prism Central and utilize Flow to set a security policy
  • B. Configure a security policy and service chain redirecting the server traffic through the firewall
  • C. Separate the web. application and database VMs on to dedicated VLANs
  • D. Create a network for each type of VM, and use policy-based routing to control the traffic flow

Answer: A

 

NEW QUESTION 56
A consultant creates a new cluster using ESXi as the hypervisor. After creating the cluster, the consultant begins to run Life Cycle Manager (LCM) updates. During the LCM upgrade pre-checks, an error is returned.
Which configuration is causing this issue?

  • A. ESXi cluster admission control is disabled.
  • B. ESXi cluster DRS is enabled.
  • C. ESXi cluster admission control is enabled.
  • D. ESXi cluster HA is enabled.

Answer: C

 

NEW QUESTION 57
An administrator is configuring an All Flash cluster to support the following workloads:
* Full clone virtual desktops
* Hadoop
* Write heavy databases
Whichthree correct configuration options should the administrator use to meet the item requirements? (Choose three.) For each procedure, indicate whether it is a correct or incorrect procedure that must be configured to meet the item requirements using the drop-down option.

Answer:

Explanation:

Explanation

Ref:

 

NEW QUESTION 58
A consultant is setting up a new Hyper-V cluster. The customer requirements are as follows:
* VMs should automatically failover to another host if the host crashes
* Host CPU and Memory resources should be evenly balanced
* New VMs should be placed on the host with the most resources available Which two Hyper-V features can be used to meet the requirements? (Choose two.)

  • A. Failover Clustering
  • B. Distributed Resource Scheduler
  • C. Performance Resource Optimization
  • D. High Availability

Answer: A,C

 

NEW QUESTION 59
A CEO asks the IT administrator to provide a list of required resources to protect current workloads and the two new SQL servers from a disaster. The Nutanix environment is managed by Prism Central.
Which option explains how to meet the CEO's request?

  • A. Create a new Recovery policy by selecting the VM that needs to be protected and get hardwarerequirements.
  • B. Create a new scenario based on a new cluster based on a VM Profile and select Recommend.
  • C. In Capacity Runway, select Optimize Resources and select all VMs that must be protected.
  • D. Create a new project and assign theVMs to it to get compute and storage requirements.

Answer: A

 

NEW QUESTION 60
A consultant configures a Nutanix cluster and integrates the hosts into vCenter using VMware best practices.
The customer has requested that the Nutanix cluster only have a single datastore.
Upon configuring the cluster per the customer requirements, vCenter displays an alert regarding the heartbeat datastore. The consultant adds the das.ignoreInsufficientHbDatastore value = true rule. The container can be seen from each host, but the alert remains active.
What should the consultant do to resolve this issue?

  • A. Turn off and then turn back on HA.
  • B. Whitelist the vCenter IP address within Prism.
  • C. Make sure the DRS setting is turned on.
  • D. Create a second container.

Answer: A

 

NEW QUESTION 61
An organization is running a Nutanix Cluster based on AOS 5.10.x and VMware vSphere 6.7. Currently, the CVM network is segmented and Storage only nodes not present.
A new security project based on NSX is coming. VMware Distributed Virtual Switches are required. The administrator needs to prepare the environment for the new project.
Which step should the administrator use to initiate the project?

  • A. Manually disable CVM network Segmentation
  • B. Enable Nutanix Flow at the Prism Central Level
  • C. Convert storage only nodes into vSphere nodes
  • D. Enable Jumbo Frames to accommodate network frames

Answer: D

 

NEW QUESTION 62
A consultant is onsite and needs to start their Foundation Virtual Machine (FVM) to image Nutanix hardware.
The FVM fails to boot. The consultant decides to use a different Foundation method.
Assuming the nodes will discover, which Foundation type or configuration option should the consultant select?

  • A. Foundation VM
  • B. Use IPMI MACs
  • C. Foundation Applet
  • D. Use IPMI IPs

Answer: C

 

NEW QUESTION 63
An administrator inherits a new Nutanix environment and logs in to a CVM to check the network configuration. The configuration is as follows:

Which action should the administrator take to improve network performance?

  • A. Configure balance-sib or balance-tcp mode for br0-up if switch configuration allows
  • B. Add eth0 and eth1 to the br0-up bond
  • C. Configure VLAN tagging both on br0 and br1 and their physical interfaces.
  • D. Remove one 10 Gbs interface from br0-up to make sure all 10 Gbs can be used.

Answer: A

 

NEW QUESTION 64
A consultant needs to verify the make and model of the systems that will be imaged with Foundation. The consultant does not have the Bill of Materials (BOM) available to review.
When should the consultant verify the make and model to prepare for the cluster deployment?

  • A. While conducting the Tech Review Call
  • B. When reviewing the Statement of Work (SOW)
  • C. Upon arriving on-site
  • D. During the Foundation Process

Answer: D

 

NEW QUESTION 65
An administrator needs to initiate a new VDI project within a couple of months. Prism Central reports there are no storage resources to accommodate such workloads.
The administrator sees many powered-off VMs and has the authority to delete test VMs powered off at least for 30 days. Test VMs belong to the Test category.
Using Prism Central, which steps are required to identify the correct VMs tobe deleted?

  • A. Use Capacity Runway to filter by Test and Powered-off VMs
  • B. Create a new Scenario selecting Test VMs. filter by uptime
  • C. Create a new Project selecting Test VMs,sorting by power state
  • D. Filter VMs list, choose Test category and Inactive under Efficiency

Answer: D

Explanation:

 

NEW QUESTION 66
An administrator has two clusters: Site A and Site B.
Async DR is configured between the clusters as follows:
* Site A is the Primary Site
* Site B is the Secondary inactive Site, no VMs running
* Site A is fully in Production
* Site B used as Backup/Disaster Recovery
The customer wants to perform a planned failover between the sites.
How should the administrator accomplish this?

  • A. Click Activate on the Secondary site within the Data Protection Dashboard
  • B. Choose Migrate on the Secondary site within the Data Protection Dashboard
  • C. Click Activate on the Secondary site and run deactive NCLI command on Primary site
  • D. Choose Migrate on the Primary sitewithin the Data Protection Dashboard

Answer: D

Explanation:
Explanation
Ref:https://portal.nutanix.com/page/documents/details?targetId=Web-Console-Guide-Prism-v510:wc-protection-

 

NEW QUESTION 67
......

2021 Valid NCS-Core  test answers & Nutanix Exam PDF: https://www.dumpsquestion.com/NCS-Core-exam-dumps-collection.html

Pass Nutanix NCS-Core Exam With  Practice Test Questions Dumps Bundle: https://drive.google.com/open?id=1ausw2ki6QXa61t7cMNAP79K7KzK_DJDf