SAP C-IBP-2202 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Create statistical forecast using historical data with basic methods
  • Planning Operators & Application Jobs
Topic 2
  • Define and view information with user-defined charts and dashboards
  • Supply and Response
Topic 3
  • Configure supply planning, run various solvers to generate planning results
  • Solution Architecture
Topic 4
  • Use the Fiori Launchpad to customize the UI, work with Excel UI
  • Key Figures & Attributes

 

NEW QUESTION 18
Which of the following approaches could you take to reduce run times of an optimizer? Note: There are
2 correct Answers to this question.

  • A. Increase the use of incremental lot size beyond the frozen horizon.
  • B. Avoid using telescopic time buckets.
  • C. Split into multiple planning areas to support weekly vs. daily planning needs.
  • D. Use a subnetwork ID to reduce the size of the problem.

Answer: B,D

 

NEW QUESTION 19
Analytics charts are created by the user in the Advanced Analytics application. What actions are possible in the Advanced Analytics app?
Note: There are 2 correct Answers to this question.

  • A. Group data.
  • B. Merge charts together.
  • C. Open graphics in Excel.
  • D. Apply filters on your data.

Answer: A,D

 

NEW QUESTION 20
You have set up infinite S&OP heuristics for unconstrained planning. What must you do to model inputs as constraints?
Note: There are 2 correct Answers to this question.

  • A. Create product substitutions.
  • B. Model adjusted transport receipts.
  • C. Enter transportation lead times.
  • D. Set minimum and maximum lot sizes.

Answer: B,C

 

NEW QUESTION 21
What actions can be performed in the Advanced Dashboards application? Note: There are 3 correct Answers to this question.

  • A. Add process templates.
  • B. Rename the charts.
  • C. Organize charts.
  • D. Link two analytics charts.
  • E. Display all assigned analytics on a single UI.

Answer: A,C,E

 

NEW QUESTION 22
Which conditions are prerequisites for key figure disaggregation?

  • A. The key figure is calculated and aggregation mode is selected.
  • B. The key figure is stored and editable.
  • C. The key figure is calculated and editable.
  • D. The key figure is set to Not Editable.

Answer: B

 

NEW QUESTION 23
Which of the following are functions of SAP IBP for demand? Note: There are 3 correct Answers to this question.

  • A. Detailed statistical analysis of demand data using predictive analytics tools
  • B. Detailed statistical analysis of demand data using the supply chain algorithm library
  • C. Demand sensing of demand data using predictive analytics tools
  • D. Demand sensing of demand data using the supply chain algorithm library
  • E. Embedded, on-the-fly demand analytics

Answer: A,D,E

 

NEW QUESTION 24
You create an S&OP operator for heuristics on an SAP IBP project. What must you enable for the S&OP operator that is specifically relevant for subnetworks?

  • A. Supply propagation
  • B. Normalize Quotas parameter
  • C. Compute Expected Supply parameter
  • D. Balance Receipts parameter

Answer: C

 

NEW QUESTION 25
What are the ways to achieve rolling aggregation with SAP IBP?

  • A. Using aggregation mode average
  • B. Using local member
  • C. Using attribute as a key figure
  • D. Using key figure calculation

Answer: A

 

NEW QUESTION 26
Which of the following data can be tracked using a change-history-enabled key figure? Note: There are 3 correct Answers to this question.

  • A. Scenario ID
  • B. Key figure type
  • C. Attributes
  • D. Modified date
  • E. Reason code

Answer: C,D,E

 

NEW QUESTION 27
What are S&OP operator (optimizer) parameters associated with demand fair share?

  • A. Number of fair share segments. Additional tiering costs (default). Target inventory violation cost
  • B. You want to copy a custom planning area that was built during the SAP IBP implementation to model a separate process.
  • C. Number of fair share segments. Maximum inventory. Additional tiering costs (default)
  • D. Number of fair share segments. Additional tiering costs (default). Number of fair share segments late delivery
  • E. Number of fair share segments. Maximum days of coverage. Number of fair share segments late delivery

Answer: D

 

NEW QUESTION 28
You are invited to review a problem with a customer's SAP IBP Excel template performance. What areas with the biggest potential performance impact would you focus on?
Note: There are 2 correct Answers to this question.

  • A. Complex calculation graphs for key figures
  • B. Number of analytics charts displaying key figures' values
  • C. Excessive IBP formatting in Excel UI
  • D. Number of local members and complexity of calculations

Answer: A,C

 

NEW QUESTION 29
You are working with the inventory optimization process and you want to use a what-if analysis. What parameters are assessed by this analysis?
Note: There are 2 correct Answers to this question.

  • A. Number of planning combinations
  • B. Changed variability
  • C. Service levels
  • D. Capacity consumption

Answer: B,C

 

NEW QUESTION 30
You are modeling the introduction of a new product using Lifecycle Planning functionality in SAP IBP. What is mandatory to create in your planning area for the setup of reference product(s) to work?
Note: There are 2 correct Answers to this question.

  • A. Definition of Actual Sales business meaning for one key figure
  • B. Definition of an attribute representing the product description
  • C. Planning objects for the new product
  • D. Definition of an attribute representing the product ID

Answer: C,D

 

NEW QUESTION 31
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?
Note: There are 3 correct Answers to this question.

  • A. It checks whether the required planning level master data exists for a subset of input key figures.
  • B. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
  • C. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
  • D. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.
  • E. It checks whether the sourcing in the Production Source Item Master Data type exists.

Answer: A,C,D

 

NEW QUESTION 32
How can you check if key figure is editable or non-editable?

  • A. Using the Key Figure Calculations app
  • B. Using the Edit View and then the Edit Planning View option
  • C. Using the Web-based Planning app when selecting key figures
  • D. Using the Analytics Advanced app when selecting key figures

Answer: C

 

NEW QUESTION 33
You run a what-if analysis and use the scenario planning function. Which actions can you perform? Note:
There are 3 correct Answers to this question.

  • A. Display data in analytics.
  • B. Change scenario-specific master data.
  • C. Share data with other users.
  • D. Run a scenario-specific inventory optimization job.
  • E. Run a scenario-specific demand sensing job.

Answer: A,C,D

 

NEW QUESTION 34
Time profiles are made out of levels, which are in turn made out of periods. What are the ways SAP IBP identifies profiles and periods?

  • A. Periods are identified by an integer and profiles by an alphanumeric prefix.
  • B. Both periods and profiles are identified by an integer.
  • C. Periods are identified by an alphanumeric prefix and profiles by an integer.
  • D. Periods are identified by a start and end date and profiles by an integer.

Answer: D

 

NEW QUESTION 35
What setting is mandatory in the Manage Lifecycle Planning app when introducing a new product?

  • A. Define which phase-in and phase-out profiles can be used within Lifecycle Planning
  • B. Define which key figure can be used as sales history for new products
  • C. Define at least one attribute of the planning area which represents the Product ID
  • D. Define which is the attribute ID for the Lifecycle profiles

Answer: B

 

NEW QUESTION 36
You have set up a planning area and data is available. You adjust the necessary time profile settings and run the consistency check.
Which settings can you change and still run a successful consistency check?
Note: There are 2 correct Answers to this question.

  • A. Change the past and future horizon of the levels in the time profile.
  • B. Remove an attribute assigned to the time profile level if the attribute is used in a planning level.
  • C. Add a new time profile level to the time profile.
  • D. Change the description of the attributes in the time profile.

Answer: A,D

 

NEW QUESTION 37
Which SAP IBP planning operator can be run to delete planning objects in a certain version?

  • A. Purge Key Figure Data
  • B. Purge Non-Confirming Data
  • C. Purge Master Data
  • D. Purge Key Figure Data Outside Planning Area Planning Horizon

Answer: A

 