The Best C-TS422-2021 Exam Study Material and Preparation Test Question Dumps
Get Ready to Pass the C-TS422-2021 exam Right Now Using Our SAP Certified Application Associate Exam Package
SAP C-TS422-2021 certification exam is intended for professionals who work in the field of production planning and manufacturing, such as consultants, project managers, and application specialists. These professionals should have a minimum of one year of experience working with SAP S/4HANA production planning and manufacturing solutions. They should also have a solid understanding of the principles and concepts of production planning and manufacturing processes.
NEW QUESTION # 36
During production order creation, several valid production versions are found. How does the system choose the production version?
- A. Alphanumeric or quota arrangement
- B. Valid period or sale order
- C. Lot size or material cost
- D. Planned order or material number
Answer: A
NEW QUESTION # 37
In the Schedule Production app which setting can you make for the planning strategy?
- A. Fitness level
- B. Direction
- C. Planning mode
- D. Fixed pegging
- E. Scheduling control
Answer: B,C,E
NEW QUESTION # 38
For what production type are production orders used?
- A. Period and quantity-oriented production
- B. Process manufacturing processes
- C. Discrete manufacturing processes
- D. Replenishment controlled by control cycles
Answer: C
NEW QUESTION # 39
When can the automatic material availability check occur in a production order?
- A. At order settlement
- B. At order creation
- C. At order release
- D. At order confirmation
Answer: B,C
NEW QUESTION # 40
Which time elements are part of a routing operation?
- A. Wait time
- B. Pick/pack time
- C. Move time
- D. Float before production
- E. Queue time
Answer: A,B,E
NEW QUESTION # 41
What does the material type influence?
- A. Which plant specific status is allowed
- B. Which material master views can be maintained
- C. Whether the material is produced in-house, procured externally or bouth
- D. Which document types are allowed
Answer: B,C
NEW QUESTION # 42
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?
- A. Fill up to the reorder stock level
- B. Fill up based on the lot size procedure
- C. Fill up to the maximum stock level
- D. Fill up to the safety stoc level
Answer: B
NEW QUESTION # 43
What happens to this dependent requirement when you convert the planned order into a production order?
- A. They are converted into a production order.
- B. They are converted into a schedule line.
- C. They are converted into a planned order.
- D. They are converted into a reservation.
Answer: D
NEW QUESTION # 44
What detremines whatherthe planned independent requirements in MRP are consumed by other requrements?
- A. Consumption sequence procedure
- B. Requirements type
- C. Requirements profile
- D. Order type
Answer: B
NEW QUESTION # 45
Which time elements are relevant for lead time scheduling of a production order?
- A. Total replenishment lead time
- B. Setup time
- C. Float after production
- D. Planned delivery time
Answer: C,D
NEW QUESTION # 46
In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?
- A. MRP group
- B. MRP controller
- C. MRP planning file
- D. MRP type
Answer: B
NEW QUESTION # 47
What does it mean for the production planner when MRP works with infinite capacities?
- A. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
- B. MRP creates capacity requirements without checking the capacity of a work center.
- C. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
- D. MRP creates capacity requirements only if the work center has sufficient capacity.
Answer: B
NEW QUESTION # 48
You want to create a production order from a planned order. What methods could you use?
- A. Combined conversion
- B. Collective conversion
- C. Partial conversion
- D. Order release
Answer: B,C
NEW QUESTION # 49
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?
- A. SAP Hybris
- B. SAP Ariba
- C. SAP Fieldglass
- D. SAP Concur
- E. SAP SuccessFactors
Answer: B,C,D
NEW QUESTION # 50
You want to use capacity availability checks for production orders. Which settings have to be made for this?
- A. The PRT Availability Check must be set in the checking control.
- B. A checking rule must be assigned in the checking control
- C. An overall profile must be assigned in the checking control.
- D. The Relevant for Finite Scheduling indicator must be set
Answer: C,D
NEW QUESTION # 51
Which chart types does the tabular planning table provide in SAP S/4HANA
- A. Order (dispatched) chart
- B. Work center capacities chart
- C. Order (pool) chart
- D. Capacity requirements chart
Answer: B,D
NEW QUESTION # 52
You have a schedule agreement whit a vendor. You want classic MRP to automatically create schedule lines in case of material shortage.
What must you do?
- A. Set the creation indicator for purchase requisitions on initial screen of MRP run
- B. Add the agreement to the quota arrangement and mark it for MRP revalance.
- C. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
- D. Add the agreement to the source list and mark it for MRP revalance.
Answer: C,D
NEW QUESTION # 53
What are the possible results of a production planning run in Advanced Planning (PP/DS)?
- A. Scheduling agreement schedule line
- B. Production order
- C. Stock transport order
- D. Purchase requistion
- E. Planned order
Answer: A,D,E
NEW QUESTION # 54
......
Get Special Discount Offer of C-TS422-2021 Certification Exam Sample Questions and Answers: https://www.dumpsquestion.com/C-TS422-2021-exam-dumps-collection.html
Enhance Your Career With Available Preparation Guide for C-TS422-2021 Exam: https://drive.google.com/open?id=1TOo2qJ0l8yiYP6nNEHbOKtKJVg7wjqMT